… (FDOT) for signalization – installing a traffic light – at the intersection of 510 and Harbor Isle Way. That intersection provides the entrance to …
Google Alert – fdot
Wabasso Causeway: Long-awaited bridge work to get underway – Vero News
Florida Department of Transportation officials say no vehicle lanes will be … In September 2021, work had already begun on FDOT's bike and …
Google Alert – fdot
The tale of the rail: FDOT finally ready to install new guardrails on the Wabasso Bridge
After months of study, FDOT finally settled on a railing system used by the California Department of Transportation. That alternative, however, came …
Google Alert – fdot
Trees at Wabasso Causeway Park sustain damage from Hurricane Nicole – TC Palm
FDOT began restoration efforts Nov. 17, he said, and Wabasso Causeway park now is looking as good as new; all of the trees have been replanted.
Google Alert – fdot
FDOT removed invasive trees at Wabasso Causeway on Indian River Lagoon – TCPalm
The Florida Department of Transportation removed the trees last month, spending about $ 112000.
Google Alert – fdot
Railing system for Wabasso Bridge better than nothing, cyclists say – TC Palm
FDOT now plans an $ 880,000 railing system, the same that's used by the … safe as the chain-link proposal, bicyclists say FDOT's plan could work.
Google Alert – fdot
Wabasso bridge will get a prettier safety barrier, but at five times the original cost – TC Palm
The Florida Department of Transportation already had begun installing a … FDOT halted the work and now plans to adopt a system in use by the …
Google Alert – fdot
State officials halt safety fence construction on Wabasso bridge in Indian River County – TC Palm
INDIAN RIVER COUNTY— After complaints from the towns of Orchid and Indian River Shores, the Florida Department of Transportation has halted construction of …
Google Alert – fdot
