So after a long study, FDOT announced it will be replaced with this 65-foot fixed span bridge. The $ 72 million construction project will begin after 2026.
Google Alert – fdot

Where to Find Jobs in Florida
So after a long study, FDOT announced it will be replaced with this 65-foot fixed span bridge. The $ 72 million construction project will begin after 2026.
Google Alert – fdot